Arnold, CA…For Days 15 – 20 we worked several hours per day on the project. Much of it wasn’t camera worthy as we dug a hole for the spring sump tank & pump installed so it push water up to the water tanks. In this video we started lunch and finished up getting the roof […]
Arnold, CA…For Days 10 – 15 mother nature intervened again and dropped more moisture on the cabin site. The soil is a clay mixture and if you work too much on it while it is wet it really makes a mess. The weather set us back a bit but now it looks to be warm […]
Arnold, CA…For Day 10 we started working on the ceiling & loft joists. First though coffee was in order. As we clear trails on the property we try to put the twigs and branches to a good use. So they looked to have enough BTUs to percolate a pot of coffee and and get ready […]
Arnold, CA…For Day Nine we finally got back to work on the actual cabin after a necessary detour to get the basics of our water system in place. In this video we just did a bit of clean up on the tops of the walls as we get ready to finally get a roof on […]